Comment on cycle route plans for Hertford and East Herts

By | 14th July 2024

The East Herts Local Cycling and Walking Infrastructure Plan is being developed and the planners need your feedback on their work so far. The current work has identified primary and secondary routes which should be developed using data from the Propensity to Cycle tool and other sources. These walking and cycling routes are designed to link residential areas to employment, shops, stations and schools. These plans matter to WelHatCycling as we know many members cycle from Welwyn Garden City to Hertford, Ware and beyond.

Draft plan cycle routes from Hertford to WGC

The draft plan shows four routes for development linking Hertford to WGC, shown in the excerpt above:

  • The existing Cole Green Way, designated as a primary route. (This cycle path is the National route 61 from Maidenhead to Rye House);
  • The Old Coach Road (the former A414) and Black Fan Road, also a primary route;
  • The track across Panshanger Park from Thieves Lane to Panshanger Lane, which is marked as secondary;
  • B158 Lower Hatfield Road to Essendon, also secondary.

The current plan is simply about identifying routes. Once these routes are agreed, a more detailed cycling and walking plan for East Herts will be created with a ranked list of costed priority projects. This will involve site surveys and will take account of the need to, for example, build segregated cycle paths next to busy roads (as is likely in the case of the B158) and create safe crossings of major roads like the A414 (as would be needed for the Old Coach Road to reach Black Fan Road). The A414 is recognised as a significant issue as it blocks many useful routes due to poor or dangerous crossings which need fixing. The final cycling and walking plan, once approved by East Herts Council, will then be used to bid for funds to build the priority routes.

The plan covers the whole of East Herts including Ware, Buntingford, Bishops Stortford and Sawbridgeworth. So there will be other rural and town routes you may wish to comment on.

The feedback needed is:

  • Do the routes connect the locations where you want to go?
  • Do they need any upgrades?
  • Are there any problems that would prevent you from using these routes?

The deadline for feedback is 19th August 2024. Please use the link on cycling plan page to add yours.

The equivalent Welwyn Hatfield Local Cycling and Walking Infrastructure Plan was approved in March 2023. You can see that approved plan via this link.

Leave a Reply

Your email address will not be published. Required fields are marked *